第16回
志賀原子力発電所 大雨によるモニタリングポストNo.1の故障について
著者:
藤井 翔馬,新屋 和彦,(北陸電力)
発刊日:
公開日:
キーワードタグ:
On August 31st 2018, the measurement of the radiation dose rate in the air was stopped because the monitoring post No. 1 was shut down by the local flood after a heavy rain in the Noto area of Ishikawa Prefecture. The heavy rain which we didn’t have in the past was occurred in a short time and a large amount of fallen leaves and branches blocked the drainage around the station of the monitoring post No. 1, and also the station of the monitoring post No. 1 was located in a low-lying depression. As the final ...
英字タイトル:
Failure of monitoring post No.1 by heavy rain at Shika Nuclear Power Station