![...](/img/main_bg8.jpg)
更新情報
第16回
志賀原子力発電所 大雨によるモニタリングポストNo.1の故障について
著者:
藤井 翔馬,新屋 和彦,(北陸電力)
発刊日:
公開日:
キーワードタグ:
heavy rain monitoring post natural disasters Shika Nuclear Power Station
藤井 翔馬,新屋 和彦,(北陸電力)
発刊日:
公開日:
キーワードタグ:
heavy rain monitoring post natural disasters Shika Nuclear Power Station
On August 31st 2018, the measurement of the radiation dose rate in the air was stopped because the monitoring post No. 1 was shut down by the local flood after a heavy rain in the Noto area of Ishikawa Prefecture.
The heavy rain which we didn’t have in the past was occurred in a short time and a large amount of fallen leaves and branches blocked the drainage around the station of the monitoring post No. 1, and also the station of the monitoring post No. 1 was located in a low-lying depression. As the final ...
英字タイトル:
Failure of monitoring post No.1 by heavy rain at Shika Nuclear Power Station
英字タイトル:
Failure of monitoring post No.1 by heavy rain at Shika Nuclear Power Station