第15回
RPV胴板の内部亀裂に対する構造健全性評価
著者:
板谷 雅雄,新川 嘉英,(東芝ESS),神長 貴幸,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
When quasi-laminar defects are detected in the RPV shell, these defects are modeled to single circular crack with a diameter of 2a and an angle of ? from RPV wall enveloping these micro-defects like as the model used in the structural integrity assessment for Doel-3. An acceptable crack size is investigated for fracture assessment and initial crack size considering the fatigue crack growth by 60 years operation due to the JSME Fitness-for-Service (FFS) code. It was found that the initial crack with 2a of 4%...
英字タイトル:
Structural Integrity Assessment for Internal Crack in RPV Shell
第15回
ライザーブレースアーム溶接部の構造健全性評価手法の検討
著者:
岩松 史則,廣川 文仁,(日立GE),神長 貴幸,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
Flaw evaluation method for riser brace arm weld was investigated in case of a flaw is detected in in-service inspection. Weld residual stress was evaluated using 3-D finite element model considering structure of riser brace. Fatigue and SCC crack growth evaluation was performed using evaluated residual stress and stress due to normal operation. Two methods, which are JSME fitness-for-service code and influence function method, were applied to estimation of stress intensity factor to investigate effect of st...
英字タイトル:
Structural Integrity Assessment for Riser Brace Arm Weld
第15回
保温材上から測定可能なパルス式渦流探傷装置を用いた減肉配管の肉厚測定
著者:
吉田 正志,(東京電力HD) 田中 良彦,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
Pulsed Eddy Current Testing (Pulsed ECT) has a potential to reduce costs and time for pipe wall thickness measurement because it can be applied from outside of heat insulation material. Artificial defects on pipe specimen and actual piping at a power plant were inspected by Pulsed ECT. Detected positions of artificial defects were coincided well with the actual positions. It was possible to map the wall thickness of the actual power plant piping without removing wire mesh on the surface and to identify rema...
英字タイトル:
Wall thickness measurement of thinning pipe by Pulsed Eddy Current Testing device through heat insulation
第16回
危険感受性・敢行性の客観データに基づく評価
著者:
伊藤 誠人,吉田 康貴,高橋 信,狩川 大輔,(東北大),鹿毛 佳子,池野 太郎,吉田 久,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
The purpose in this research is to verify whether risk recognition can be explained not only by the subjective evaluation methods but also by the objective evaluation based on autonomic nervous activity. In the present study, a fundamental method to realize objective risk recognition evaluation has been proposed using heartbeat data in the safety education at experiential training facilities. Based on the results obtained in this research, it has been confirmed that risk-taking behavior characteristics can ...
英字タイトル:
Evaluation of risk sensitivity and risk taking behavior based on objective measurements
第16回
原子力発電所の保守管理規程/指針(JEAC4209/JEAG4210)改定の検討状況
著者:
鈴木 直浩,(中部電力),笠毛 誉士,(九州電力),真壁 知宏,(東京電力HD),中廣 雄一,(関西電力),堀水 靖,(JANSI)
発刊日:
公開日:
キーワードタグ:
Principles of Nuclear Power Station's maintenance was established as Code for Maintenance at Nuclear Power Plants (JEAC 4209) in 2003 and revised in 2007,2014 And also Guide for Maintenance at Nuclear Power Plants was established in 2007 and revised in 2014. Recently these Code & Guide were revised accordingly and published as JEAC4209-2016 and as JEAG 4210-2016. Revising these Code & Guide are now under review. Points of the revision is to implement the new regulatory inspection system enforced in 2020 ref...
英字タイトル:
Progress report of Revising Code and Guide for Maintenance at Nuclear Power Plants
第15回
原子力規制検査の試運用に向けた準備状況
著者:
村野 兼司,星川 茂則,藤曲 久元,梶川 允,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
New nuclear regulation inspections will begin in April 2020. For the preparation of them, Trial use will begin on October this year, and we have assigned Kashiwazaki-Kariwa Nuclear Power Station as a pilot plant for it. This report describes the status about Corrective Action Program (CAP) improvement and Configuration Management (CM) development for the trial use and implementation of a new nuclear regulation inspection, cooperating with NRA study of it....
英字タイトル:
Preparation Status of Trial Use for Nuclear Regulation Inspection
第16回
原子力規制検査の試運用状況について
著者:
星川 茂則,藤曲 久元,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
New nuclear regulation inspections will begin in April 2020. For the preparation of them, Trial use will begin on October this year, and we have assigned Kashiwazaki-Kariwa Nuclear Power Station as a pilot plant for it. This report describes the status about Corrective Action Program (CAP) improvement and Configuration Management (CM) development for the trial use and implementation of a new nuclear regulation inspection, cooperating with NRA study of it....
英字タイトル:
Status of Trial Use for Nuclear Regulation Inspection
第15回
柏崎刈羽原子力発電所における系統監視活動について
著者:
猪口 秀一,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
One of the most important lessons learned from the Fukushima accident is the lack of technical proficiency. From that perspective, a strategic plan was developed to establish an organization of knowledgeable engineers who are familiar with and accountable for the performance and reliability of important plant systems. The System Engineering Group was founded in Kashiwazaki-Kariwa NPS in 2013 and started system performance monitoring as one of its core activities in 2016. In this report, the process used for...
英字タイトル:
System monitoring activity at Kashiwazaki-Kariwa Nuclear Power Station
第15回
津波により福島第二原子力発電所に浸入した海水の扱い及び処理技術
著者:
矢羽々 寛和,上坂 昌生,渡邊 貴之,矢内 誠,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
Large amount of sea water intruded Reactor Buildings including controlled area of Fukushima-Daini Nuclear Power Plant (NPP) at the Tsunami disaster 11th May 2011 and the sea water was contaminated by some radioactive substances. Although the concentration of the radioactive substances was low enough to meet the criteria of technical specification for discharge to the sea、we decided to decontaminate it under the limit of the detection for more safe. Then the result of the discussion with local government and...
英字タイトル:
The Safety Handling Technic of the Sea Water that intruded Fukushima-Daini NPP at the Tsunami Disaster 2011
第16回
監視試験片再生接合技術の実機適用性評価
著者:
田中 重彰,森島 康雄,小川 琢矢,服部 泰大,(東芝ESS),和田 将樹,(日本核燃料開発),神長 貴幸,(東京電力HD)
発刊日:
公開日:
キーワードタグ:
In the application for approval of nuclear power plant operation period extension, it is required to carry out two surveillance tests separately from the conventional plan. At this time, it is necessary to compensate for the surveillance test piece by reconstitution bonding of the used test specimen, since the shortage of the test specimen is expected. Although the used test piece of the welded part is used for the reconstitution bonding of the heat affected zone (HAZ) test piece, the test piece collection ...
英字タイトル:
Applicability of Reconstituted Surveillance Test Piece for RPV Embrittlement Evaluation