東海再処理施設の緊急時における安全対策(その2)


英字タイトル:
Emergency safety measures at the Tokai reprocessing plant(Part 2)
著者:
大内 雅之 Masayuki OHUCHI 星 貴弘 Takahiro HOSHI 佐々木 俊一 Shunichi SASAKI 磯部 洋康 Hiroyasu ISOBE 長岡 真一 Shinichi NAGAOKA 倉林 和啓 Kazuaki KURABAYASHI 大部 智行 Tomoyuki OHBU
発刊日:
公開日:
カテゴリ: 第12回
キーワードタグ:

概要

Plutonium nitrate solution is stored in tanks that have cooling system to prevent boiling accident by decay heat and scavenging system to prevent explosion of hydrogen generated by radiolysis. These systems are designed to be provided power from emergency power generators at the Tokai reprocessing plant (TRP) when commercial power is lost. In addition, some apparatus (mobile power generators and nitrogen gas cylinder to scavenge hydrogen, etc.) are recently deployed at TRP on the basis of power loss in Fukushima Daiichi nuclear accident. In this report, these safety measures for emergency are shown.


全文掲載のPDFファイルダウンロード