(4)泊発電所3号機の建設・試運転状況について
英字タイトル:
The status of construction and trial operation of Tomari nuclear power station unit No.3
著者:
大内 全 Tamotsu OHUCHI
発刊日:
公開日:
ConstructionNuclear Power StationPWRTomari
The status of construction and trial operation of Tomari nuclear power station unit No.3
著者:
大内 全 Tamotsu OHUCHI
発刊日:
公開日:
カテゴリ: 第6回
キーワードタグ:ConstructionNuclear Power StationPWRTomari
概要
Tomari nuclear power station unit No.3 is currently under trial operation since March 2009. The construction started in November 2003. This reactor is a type of PWR and generates 912,000 kilowatts of electricity. The power station has the f ollowing features; 1) Adoption of integrated digital instrumentation and control system, 2) Adoption of high efficiency steam turbine, 3) Adoption of some remedial measures for steam generator. The status and these features are introduced..