概要

It is reformed the regulatory inspection framework for nuclear facilities to Risk-Informed and Performance-based inspection framework. Considering the word "Performance-based", I introduce examples of status of Corrective Action Program (CAP) system program, education of Significance Determination Process (SDP), Temporary Configuration Change (TCC) in The Kansai Electric Power, so that we licensee should recognize mind change to this challenge from checklist type/prescriptive former inspection framework to the new performance-based regulatory inspection framework.