第16回
志賀原子力発電所 大雨によるモニタリングポストNo.1の故障について
著者:
藤井 翔馬,新屋 和彦,(北陸電力)
発刊日:
公開日:
キーワードタグ:
On August 31st 2018, the measurement of the radiation dose rate in the air was stopped because the monitoring post No. 1 was shut down by the local flood after a heavy rain in the Noto area of Ishikawa Prefecture. The heavy rain which we didn’t have in the past was occurred in a short time and a large amount of fallen leaves and branches blocked the drainage around the station of the monitoring post No. 1, and also the station of the monitoring post No. 1 was located in a low-lying depression. As the final ...
英字タイトル:
Failure of monitoring post No.1 by heavy rain at Shika Nuclear Power Station
第17回
志賀原子力発電所におけるプラント停止時の安全管理の 強化について
著者:
山口 達也,西村 隆人,長田 真吾,吉田 友城,小路 和己,塚本 高輝,(北陸電力)
発刊日:
公開日:
キーワードタグ:
Shutdown safety control is important because most of the troubles occur in nuclear power plant during plant shutdown. In Shika nuclear power plant to deal with such situation, we thought we need to reinforce shutdown safety control. Therefore we considered “Which equipment should be protected during plant shutdown”, ”How to protect the equipment” and “Standards for setting up scaffolding around the equipment”, etc. and we reinforced shutdown safety control. This time, we would like to introduce the way to r...
英字タイトル:
Reinforcement of shutdown safety control in Shika nuclear power plant
第17回
志賀原子力発電所におけるリスク情報を活用した意思決定に係る 取り組みについて
著者:
四十田 俊裕,新谷 俊幸,(北陸電力)
発刊日:
公開日:
キーワードタグ:
Nuclear Power Companies have decided to introduce a Risk Informed Decision Making (RIDM) process into the management of their power plants, based on the lessons learned from the accident at the Fukushima Dai-ichi Nuclear Power Station. The strategic plan and action plan for the realization of Risk Informed Decision Making (RIDM action plan) were published in February 2018. This paper introduce the risk management system established at Hokuriku Electric Power Company to implement the RIDM process. The risk m...
英字タイトル:
Approaches to Risk Informed Decision Making at Shika Nuclear Power Station
第15回
志賀原子力発電所における安全性向上の取り組み
著者:
谷出 信一,(北陸電力)
発刊日:
公開日:
キーワードタグ:
In order to enhance the safety of Shika Nuclear Power Station, we take various countermeasures against earthquake, tsunami and other natural disasters based on the lessons learned from Fukushima Daiichi Nuclear Power Station Accident. We also take safety improvement measures which meet the new regulatory requirements. We make every effort to make the severe accident like Fukushima Daiichi Nuclear Power Station Accident never happen....
英字タイトル:
Safety Improvement Measures at Shika Nuclear Power Station