基調講演:「もんじゅ」の現状と保全活動の取組み


英字タイトル:
Current Status of Monju and Effort on Maintenance 柳澤 務 Tsutomu YANAGISAWA
著者:
一宮 正和 Masakazu ICHIMIYA 山下 卓哉 Takuya YAMASHITA
発刊日:
公開日:
カテゴリ: 第6回
キーワードタグ:

概要

Prototype fast breeder reactor “Monju“ attained the first critical on April 5th in 1994. The sodium leak accident in a secondary main co oling system was occurred during power rise examination on December 8th in 1995, and the “Monju“ has stopped after that. Various efforts such as reconstruction of the secondary cooling system and following verifications on integrity of components and facilities are contin ued towards the early restart up of the “Monju“ at present. The current status and efforts on maintenance of the “Monju“ are described.