原子力規制検査導入に向けた事業者活動の検討状況について


英字タイトル:
Industry’s Actions to Prepare for The New Inspection System
著者:
松岡 靖明 鈴木 匠 (九州電力)
発刊日:
公開日:
カテゴリ: 第15回
キーワードタグ:

概要

The current inspection system of NRA was recommended improving and simplifying the inspection framework by Integrated Regulatory Review Service from IAEA. Therefore, NRA is preparing for the improved inspection system while referring USA’s one called ROP (Reactor Oversight Process). About the New Inspection System, Japanese law (Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors) was amended in April 14, 2017, and it will come into force within 3 years. Consequently, we also should consider about Industry’s actions for the New Inspection System. In this paper, we explain our present actions to prepare for New Inspection System.


全文掲載のPDFファイルダウンロード