東海第二発電所 原子炉建屋ブローアウトパネル閉止装置の開発
概要
It has been newly required as a regulatory standard that the blowout panel installed in the reactor building of BWR can be closed promptly when it is opened. In Tokai No. 2 Power Plant, a blowout panel closing device was developed to meet this requirement. In this report, we describe the design of blowout panel closing device and report the result of vibration test conducted in E-Defense.