東海第二発電所 原子炉建屋ブローアウトパネル閉止装置の開発


英字タイトル:
Development of reactor building blowout panel closing device for Tokai No.2 power station
著者:
竹内 公人 林田 貴一 中間 昌平 (日本原電)
発刊日:
公開日:
カテゴリ: 第16回
キーワードタグ:

概要

It has been newly required as a regulatory standard that the blowout panel installed in the reactor building of BWR can be closed promptly when it is opened. In Tokai No. 2 Power Plant, a blowout panel closing device was developed to meet this requirement. In this report, we describe the design of blowout panel closing device and report the result of vibration test conducted in E-Defense.