福島第一原子力発電所第1号機~第3号機の 地震から津波来襲までの時系列評価(その2)


英字タイトル:
Time series evaluation on Fukushima Daiichi NPP units 1/2/3 from Tohoku - Pacific Ocean Earthquake to the tsunami invasion(2)
著者:
小林 正英 Masahide KOBAYASHI 奈良林 直 Tadashi NARABAYASHI
発刊日:
公開日:
カテゴリ: 論文
キーワードタグ:

概要

The Fukushima Daiichi Nuclear Power Plant units 1, 2, and 3 were evaluated to determine whether their safety functions were effective. These units, which were under operation when the Tohoku - Pacific Ocean Earthquake occurred at 14:46 JST on March 11, 2011, were analyzed via a time series evaluation from the time the earthquake occurred to the subsequent tsunami attack. The cooling function of each unit was analyzed and the results show that the cooling functions were effective during the evaluation period. In the first paper of this series, we proved that the stop and barrier functions were effective prior to the tsunami attack. Both papers show that the safety functions were effective until the tsunami attack.