高速増殖原型炉「もんじゅ」-保守の軌跡と成果-
概要
Prototype fast breeder reactor "Monju" accumulated maintenance, the repair experience more than 25 years after a test operation and got the knowledge that became extremely useful for the design of the fast reactor and operation and maintenance in the future. A maintenance program was introduced as a fast reactor power plant at the Stage of Research and Development, and problems such as the maintenance management became clear and examined the way of the maintenance management based on these experiences.