伊方SSHACプロジェクトの成果を活用した更なる安全性向上に 向けた四国電力の取り組み


英字タイトル:
Shikoku Electric Power's efforts to improve safety using the result of IKATA SSHAC Project
著者:
片上 雄介 橋本 望 西坂 直樹 岡田 将敏 下口 裕一郎 増田 啓介 (四国電力)
発刊日:
公開日:
カテゴリ: 第17回
キーワードタグ:

概要

Shikoku Electric Power Co. is making efforts to introduce Risk-Informed Decision Making (RIDM) aiming at continuous improvement of safety including, but limited to, the regulatory framework. As an effort to improve Probabilistic Risk Assessment (PRA) to be utilized in RIDM, “Ikata Unit 3 Project” has been implemented and enhancement of PRA. We will introduce our additional safety improvement effort and the development of Seismic PRA using the results of "Advancement of Seismic Hazard Assessment" implemented as one of the technical issues of the Ikata Unit 3 Project.